Location:Fukushima City, (Ltd.) Tada Corporation Construction Work Office
http://www.tada-kensetsu.com/
Object to be processed:Dehydration of polluted water and side sedimentation generated by spinback method (using high pressure washing water)
Location:Toyohi Seiko Co., Ltd. Kitakyushu factory
http://www.hoyo-g.co.jp/HOYO/company/index5_5.html
Objects to be processed:Waste liquid when manufacturing interior automobile parts
SR 5000 move-in status (to 2nd floor of the building)
SR 5000 Installation status
Eco-Pouch Type III type installation status
※Eco-Pouch Type III・・・New product (PP woven change + inner filter bag)
The condition of dehydrate cake immediately pour into Eco-Pouch (after 24 hrs)
Right: Waste water Left: Treated water (desorbed liquid / water dehydrated from Eco-Pouch)
◆The treated water is 100% recycled as washing water for interior parts in the factory.
Location:Nagano Prefecture
Object to be processed:Sludge of Sabo dam
Sabo dam panorama, Eco-Pouch setting status
Modification of Flocculant in SR5000 Slow Stirring Tank
Eco-Pouch interior (dehydrated cake) after dehydration
the situation after removing dehydrated cake
※Eco-Pouch is an elastic container for transportation and storage
Location:Oita Prefecture Water Purification Plant
Object to be processed:sludge generated by purification treatment
Eco-Pouch installation situation
※Pouch hanger mounted on trailer chassis
Eco-Pouch interior (dehydrated cake)
Removing status of dewatered cake
※Eco-pouch used for transportation, storage as flexible control bag
Eco-Pouch installation status (immediately after sludge input)
※pouch hanger uses single pipe scaffold