Introduction of MC method as sludge treatment / intermediate (dehydration) treatment facility at the water treatment plant

Location:Oita Prefecture Water Purification Plant
Object to be processed:sludge generated by purification treatment

SR 3000 installation status
③

 Eco-Pouch installation situation
※Pouch hanger mounted on trailer chassis
DSCF0502

Eco-Pouch interior (dehydrated cake)
DSCF0507

Drain off water
DSCF0518

Removing status of dewatered cake
※Eco-pouch used for transportation, storage as flexible control bag
①

Eco-Pouch installation status (immediately after sludge input)
※pouch hanger uses single pipe scaffold
中津(14回) 020

 Eco-Pouch installation status (7 days after sludge input)
中津(14回 ③) 001